Description

Engineer of work for final design project involving preparation of plans, specifications and estimates for widening and realignment .8-mile of Stagecoach Lane, east of Mission Road including Fallbrook High School frontage.

Final PS&E for street widening and realignment of 6% super-elevated 2-lane collector roadway with painted median.

 

 

   
  

Work included

  • Roadway plan and profile design 
  • Drainage study and design for extension/reconstruction of existing storm drain facilities 
  • Identification of needed right-of-way and slope easements and exhibit preparation 
  • Extensive roadside grading and reconstruction of private driveway and drainage improvements 
  • Utility relocation and coordination 
  • Earthwork, cost estimation and justification
  • Preparation of technical provisions for specifications package  
  • Cross slope analysis/pavement overlay design 
  • Curve realignment and 6% super-elevation 
  • Striping and signage 
  • Low profile box culvert design, including sub-contract for structural design

 