Light Rail Transit 416.2, Stadium Segment - San Di
Description

This $65 million project consisted of constructing 3 miles of new light rail transit (LRT) main tracks. The project also required installation of traction power, catenaries, and signal systems; three at-grade LRT stations, two elevated LRT stations, and a park-and-ride lot; seven LRT bridges, one road bridge; retaining walls and fencing; installation of utility facilities and sewer line; and traffic control.

Scope of Services

Survey efforts included easements and right-of-way staking for clearing and grubbing in environmentally sensitive areas for conformance with Department of Fish and Game and Army Corps of Engineers permit requirements. Provided horizontal and vertical control retracement, design and as-built topographic surveys for connection and clearance verification.

Provided construction staking for rough grading, finish grading, bridge abutment, pier staking for seven bridge structures (11,700 feet), sewer, water, retaining walls, and replacement of property corners destroyed during construction.

 
© Copyright 2005-2008, SB&O, Inc. All Rights Reserved. Web Site by NetPros